The clearance from siding or trim to the ground should be 6 inches or more.
Wood siding best practices.
The siding has only been put on near our front front entry is fully covered by roofing and side entries at this point so we re interested to know if we should.
It s definitely a good building practice and a standard detail to leave a minimum of 1 2 inches clearance between any type of wood siding or exterior trim and any horizontal surface including a roof or wood deck.
Both the 2003 international building code ibc and the western wood products association require that solid wood siding products be nailed directly into studs or 2x blocking.
Dry siding stored on the site stickered if possible will usually acclimate to local conditions in a week to 10 days.
Installation best practices guide external facing solid wood short version 5 1 4 5 characteristics of the facility when the outside of the wall is flush with the foundation it is recommended that the furs re cover the foundation of at least 25 mm 1 inch.
In premium wood siding grades dry means that the siding has no more than 15 moisture content.
If the vapor barrier or house wrap need to be replaced as well this is the ideal time to do it.
If the wall is recessed relative to the foundation or.
After the plank is removed best practices in siding repair recommend an inspection of what was below it.
In knotty grades dry means that the moisture content does not exceed 19.
We d always hated the steel siding and so liked this idea assuming the carpenter would use best practices.
After all if the plank was warped or rotting chances are that moisture may have infiltrated the area behind it.