Over solid sheathing use minimum no.
Wood slats under roof.
Use a tool belt that has a hammer loop to hold nails a measuring tape chalk line and a hammer when installing the wood.
During a reroof inspect the decking after the shingles and underlayment have been removed.
Metal roofing panels rated for architectural use attached to purlins horizontal pieces of wood or metal fastened to roofing trusses are structurally sound when installed according to your roofing manufacturer s instructions and local building codes.
Would like to get some feedback on this idea.
Water shield is the next roofing layer that creates a water proof barrier where ice or water can buildup near the roof eaves.
Phoenix he has seen where they have screwed 1 x 4 wood slats vertically spaced over the.
When installing a metal roof over an existing roof before installing the.
Inspect the inside of your home for leaks.
Wood slats under metal roof.
I am putting on a new metal roof will tear old rolled roofing off down to decking replace repair etc as needed.
For many applications a layer of plywood underneath your metal roofing is an unnecessary expense.
If an open grid framed roof or widely spaced old solid roofing planks as the sheathing it is important to tightly stretch this so it does not sag down and hold water between the framing roof sheathing boards and the metal roofing obviously far better to put down a solid sheet sheathing first when doing a reroof in that sort of situation.
Wood shake or shingle roof installation specifications.
Solid pine wood slats twin bed mattress support wooden slats 39 in long x 2 75 in wide x 0 65 in depth pack of 13 count replacement spare parts custom size cutting service twin 39 in 39 4 0 out of 5 stars 7.
Remove drywall and insulation as necessary to locate water stains on the under side of roof decking.
Felt interlay or felt underlayment underlayment specifications for wood shingle shake roofs.
Most roof decking is made from sheets of plywood.
It s usually a peel and stick product that adheres directly to the roof deck.
30 felt lapped at least 3 inches horizontally and 6 inches at end laps.
On a rainy day look for stained drywall or wood on ceilings and in attics or crawl spaces.
Over spaced sheathing no underlayment is used except at the eaves if eaves flashing is required.